All tools

Time-of-Day Load Shift Value

. Free, runs in your browser.

Night shift or batch timing looks like an operations headache until the ToD row prices it. Put your own peak and off-peak rates in and see what a movable load is worth.

Runs entirely in your browser. Nothing you type is uploaded or stored.

1Load you can moveThis is the daily kWh that can shift without hurting production.
kWh/dayUse sub-metering, machine rating x hours, or a load study.
daysCount the days this movable load actually runs.
2From your billThe spread between the two rates decides the saving.
₹/unitType the peak energy rate or peak time block rate from your bill.
₹/unitType the lower time block rate, not a generic average.

The formula we use

monthly = units * (ratePeak - rateOff) * days

annual = monthly * 12

  • Assumes the same shiftable units and rate spread for every working day.
  • Demand charges can still change if shifting creates a new peak.
  • Operational cost can outweigh tariff saving.

Typical numbers

Reference figures to sanity-check your inputs. Your own bill and equipment data always win.

India's consumer-rights rules define a ToD tariff with 8 solar hours in a day, with actual slots set by the DISCOM order in force.

Source: Electricity (Rights of Consumers) Rules, 2023

The national ToD rule sets solar-hour tariff at least 20% below normal tariff, subject to the DISCOM order in force.

Source: Electricity (Rights of Consumers) Rules, 2023

The national ToD rule sets C&I peak-period tariff at not less than 1.20x normal and other consumer peak tariff at not less than 1.10x normal, subject to the DISCOM order in force.

Source: Electricity (Rights of Consumers) Rules, 2023

A 100 kWh/day load shifted for 250 days moves 25,000 kWh/year before any process-risk derating.

Source: BillTrends default model

BillTrends derates behavioural ToD shifting by 0.8 by default to account for missed shifts and process constraints.

Source: BillTrends default model

Common questions

What is a ToD tariff?

A ToD tariff prices electricity differently by time block. Peak periods cost more and off-peak or rebate periods cost less.

Should I move production just for ToD saving?

Only if quality, labour, delivery and safety are not hurt. This tool prices the electricity side only.

Where do I find peak and off-peak rates?

Look for the ToD, peak, normal, night, rebate or time block table on your bill or tariff schedule.