For accredited energy auditors

Field notes in. A report that holds up.

BillTrends reads the year of bills before you reach the gate, captures your site survey with safe defaults, and produces a report where every number can be challenged, and survive.

Client workspaces are sealed to your account. Your clients stay yours.

Where the evening goes

The audit is judged by the report.

Re-typing eats the analysis time

Meter tables get re-typed into spreadsheets before any real analysis can start.

Good findings get challenged

When the working behind a number isn't visible, the client questions it and you defend from memory.

The power-factor call misfires

Advice goes wrong when the real problem is an over-corrected bank, not a missing one.

Formatting eats the evening

The report layout takes the hours the analysis actually deserved.

Gate to report

Bills first. Survey second. Report ready.

Before the visit

The year, already read

Upload the client's bills and walk in knowing the demand pattern, ToD placement, and the full kWh / kVAh / kVARh lag-lead story, month by month.

On site

Capture with safe defaults

Record motors, the capacitor bank, measured THD, and whole-site measures. Every field is pre-filled with a sensible default and its healthy range, so a partial survey is still a usable survey.

Same day

Priced, sourced, printable

The report merges the bill analysis and your survey into ranked findings, each tagged with its source, ready to print or hand over.

Under the analysis

Analysis an auditor can stand behind.

Diagnosis

Reactive power, diagnosed, not guessed

From kWh, kVAh and kVARh lag/lead across the year, the engine separates under-corrected sites, swinging fixed banks, and over-corrected banks, the one case where "install more capacitors" is exactly wrong.

Sizing

APFC sized to the site

kVAr at average and peak load, switching stages granular enough for the low-load months, and a detuned-capacitor call when measured THD or non-linear load demands it.

Measures

BEE-guideline savings methods

Lighting, VFD, compressed-air, DG, transformer and ToD-shift measures priced with the methods and benchmark ranges from the BEE MSME guidance, as screening estimates, marked as such.

Economics

Capex and payback screening

Indicative ₹/kVAr and measure-wise economics so the client can prioritise, with an explicit note to verify against measured data and vendor quotations before procurement.

Built to be challenged

Your numbers show their working.

Every figure in the report carries a source badge: read from the bill, calculated from the bills, taken from the tariff order, a disclosed assumption, or surveyed on site by you. The methodology page shows the formula behind each method.

Savings are screening estimates computed with BEE MSME guideline methods, and the report says so, with an explicit instruction to verify against measured data and vendor quotations before procurement. Honesty is what makes it defensible.

The client stays in control. The audit section appears in their report only when it's switched on, and carries a printed "reflects on-site energy audit" marker when it is.

The workspace stays sealed. Client bills and survey data are visible to your account alone, and we never contact your clients.

How you work here

Your own workspace, or inside the owner's account.

Invited by the owner

A factory can share one specific client with you by email, with write access for the survey worksheet. You see that connection only, you pay nothing, and their credits stay theirs.

Collaborate without collisions

Live presence shows when someone else with access is on the worksheet, and a save is never silently overwritten by a colleague's edit.

Deliver under your name

On the paid tier the printed report carries your logo, business name and contact details on the header and the prepared-by line.

Bring the next audit

Spend the visit measuring, not re-typing.

Free preview first. Your field data stays sealed to your account either way.