Articles
Understand the power you pay for.
Plain-language reading on Indian electricity: how it is consumed and wasted, how efficiency is really achieved, how solar and audits work, and how DISCOMs and policy price it all.
Know your DISCOM
Security Deposit and ACD in Bills
Explain additional security deposit and ACD logic, why it appears on bills, and how businesses should track it separately.
8 Jul 2026Read
Solar, done properly
Shading Losses in Rooftop Solar
How parapets, tanks, chimneys, nearby buildings and future construction reduce solar output and proposal credibility.
8 Jul 2026Read
Where power goes
Single Phase vs Three Phase Factory Load
When a business needs three phase, why motors behave differently, and how connection type affects bills, safety and approvals.
8 Jul 2026Read
Solar, done properly
Solar EPC Bill Analysis Checklist
A pre-site-survey checklist for consultants: bills, tariff category, demand, PF, ToD, net metering status and client objections.
8 Jul 2026Read
Solar, done properly
Solar Payback Mistakes in India
Common solar payback errors: ignoring demand charges, ToD, export limits, degradation, demand growth and DISCOM billing mechanics.
8 Jul 2026Read
Solar, done properly
Solar Proposal Trust Problems
Why clients distrust solar proposals and how bill evidence, assumptions, exclusions and sensitivity tables make them more credible.
8 Jul 2026Read
Solar, done properly
Solar Sizing from Electricity Bills
How Indian solar EPCs can use year-round bills, contract demand, load profile and sanctioned load to size rooftop solar responsibly.
8 Jul 2026Read
Where power is wasted
Standby Losses After Factory Shutdown
Find power consumed by panels, drives, heaters, UPS, compressors and office loads after the last shift leaves.
8 Jul 2026Read
Energy pain by industry
Steel, Foundry and Cement Power Bills
Furnaces, crushers, mills, compressors, fans, harmonics and demand peaks make heavy industry bills unusually sensitive.
8 Jul 2026Read
Solar, done properly
Solar Subsidy Paperwork Realities
Set expectations on subsidy eligibility, portals, DCR rules, bank details, inspections and delays before promising clients money.
8 Jul 2026Read
Energy pain by industry
Textile Humidification and Compressor Load
How humidification, spinning, looms, compressors and shift timing shape textile mill power bills in India.
8 Jul 2026Read
Energy pain by industry
Textile and Plastics Electricity Cost India
Where power hurts textile mills and injection moulding units: motors, chillers, compressors, PF, shift load and solar fit.
8 Jul 2026Read